Keywords: Ventilation, digital twin, Computational Fluid Dynamics (CFD), pharmaceutical facilities, recirculation units, damper authority, duct pressure loss, commissioning, system testing
|
|
|
|
Kiril G. Naydenov | Jens Chr. Bennetsen | Mads Bergmann Andersen | Guillaume Cnapelynck |
Ph.D., M.Sc., Specialist Manager, Life Science and Pharma, Ramboll, KGN@ramboll.com | Ph.D., M.Sc. Head of Center of Excellence for Advanced CFD Simulations, Ramboll | M.Sc., Chief Specialist, Department for Advanced CFD Simulation | M.Sc., CFD Engineer, Department for Advanced CFD Simulation |
Pharmaceutical HVAC design has evolved through the years. Historically, facilities used dedicated once-through systems: one AHU per space/area, operating on 100% outside air with generous shafts and low duct velocities. Recirculation is practical where processes do not involve harmful substances or contaminants can be reliably filtered before return, delivering energy savings.
Life-science and pharma facilities require controlled air flows to support qualification as specified in ISO 14644-3 (2019). In recirculating systems, multiple fan curves and shared duct pressures mean that each unit’s operating point depends on the whole network. Flow migration, damper saturation and fluctuating pressures can therefore compromise commissioning, process integrity and product safety.
Commissioning requires iterative setting-to-work and flow regulation. In coupled systems, each adjustment affects the network, often requiring repeated measurement and balancing, or redesign if fans cannot meet duty. This can extend commissioning from weeks to months and jeopardies qualification schedules.
CFD can reduce overdesign. Ramboll studies have optimized air-change rates, ventilation paths and filtration; for example, a warehouse revamp project removed two AHUs and several heat pumps, saving about $1.3m CapEx and $80k/year OpEx while reducing CO₂ emissions. CFD has long assessed room and equipment performance and now supports built-environment digital twins (Nielsen, 2015; Zhang et al., 2023).
ISO 23247-1 (2021) defines a digital twin as a fit-for-purpose digital representation of an observable manufacturing element, synchronized with its physical counterpart.
This paper addresses underexplored system-level coupling of AHUs, recirculation units, ducts, dampers, and terminals. In this study, the term is used in the design-stage sense: a fit-for-purpose digital representation of the intended ventilation system, coupled bidirectionally between a network representation and a CFD representation of the same physical geometry.
The methodology focuses on a section of a pharmaceutical production facility. The system-level CFD twin couples 3D ventilation geometry, fan curves, filter losses, dampers and controls with intake/exhaust, ductwork and room flows. It predicts fan/damper operating points, pressure-drop behaviour, AHU flow redirection, and required balancing or layout changes to maintain terminal flows within tolerance. Each of the equipment underwent verification on performance matching manufacture data.
BIM/CAD geometry and HVAC layouts are combined with verified vendor equipment data. Validated components are integrated into a coupled HVAC network and full-building CFD model, enabling simulation of operating conditions, equipment interactions, airflow distribution, pressure losses and commissioning scenarios before field testing.
The mock-up comprises one main AHU and three recirculation units serving EU GMP Grade C, D and NC spaces (Figure 1). Pre-balancing simulation covers nominal operation, room-condition changes, controlled AHU flow transfer and damper arrangements.
CFD uses predominantly steady-state, supplemented by transient Star-CCM+ 2602 simulations where required. RANS k-ω SST resolves intake/exhaust, full ductwork, dampers, diffusers, grilles and door openings. Polyhedral meshes of 100–270 million cells include five prism layers, y⁺ ≈ 30–100 and a 1.5 refinement ratio. Variable-flow cases cover minimum, design and maximum flow rates.


Figure 1. HVAC system design. Left: BIM model with HVAC system. Right: CFD implementation.
Before the parametric study, the model underwent a consistency check to confirm that the simulated network reproduced physical-system behavior within design-stage tolerances. Simulated space airflow rates were compared with the mechanical-schedule design values (Figure 2 and Figure 3). An iterative proportional error-correction algorithm was applied until the specified flow rates and room pressures converged. All results were well within the 10% balancing tolerance for air flow rates, with no systematic bias suggesting topology or boundary-condition errors.

Figure 2. Comparison between designed air flow rates and obtain ones.
Damper characteristics were verified against manufacturer data. Simulated blade-angle versus pressure-drop relationships were compared with published loss curves between 30° and 50° blade angle, where 90° is fully closed. For a 200 mm duct, the largest absolute difference was 12.6 Pa and the average across cases was 4.9 Pa. Some deviation is expected because the details on manufacturer test arrangement are unknown.
Operating points for the main AHU and recirculation fans were also compared with catalogue fan curves. All simulated load cases remained within stable operating regions and design limits.

Figure 3. Pressure distribution during design optimization to achieve desired flowrate with a specific room. Desired pressures in the rooms are achieved. Pressure distribution along the distribution ductwork. Local losses at bends and T-connections.
The model is therefore considered suitable for assessing systemic trends, sensitivities and failure modes.
Like any design-stage tool, the model has boundaries that the reader should keep in mind when interpreting the results. E.g. pressure losses are computed from published fitting coefficients and manufacturer angle data, and the flow inside each duct is treated as fully developed. Uneven velocity profiles are not fully captured and would require CFD to quantify. Fan and damper behaviour are taken from catalogue data at nominal conditions. Thus, the mock-up simulation converges more “simplified” than the real installation will. Filter loading and duct leakage are not part of the current simulation. Control logic is represented in it’s a stepwise steady-state form. The model is a reliable indicator of trends, sensitivities and failure modes, and is intended to complement site measurements before commissioning.
Commissioning of coupled multi-unit configurations is inherently iterative. Each adjustment propagates through the network. An example calculation for a 20.000 m³/h suite (100 diffusers at 400 m³/h; 50 dampers; 20 branches; 10 spaces) using standard proportional balancing is shown in Table 1. Every iteration includes measurement of all diffusers. Standard iterations re-adjust 25–40% of dampers; systemic restarts, triggered when a recirculation unit or the main AHU cannot deliver required flow and differential pressure to reference point. The comparison on commissioning effort shows a significant benefit both on time and relatable cost using the CFD based Digital Twin approach.
Table 1. Example of estimated commissioning effort with and without a design-stage CFD digital twin. The CFD digital-twin is assumed ready at the start of the commissioning phase. Time for balancing (assumed): Diffuser 10 min; Terminal Damper 15 min; Branch damper 15 min; Admin 4-5 hours in total.
Item | Without digital twin | With digital twin (estimated) |
Iterations (assumed) | 5-10 | 2-5 |
Systemic restarts | 2–5 | ≈ 0 |
Balancing effort | 10 working days | 5 working days |
Redesign + install + rebalance | +5–60 days | Rarely required |
Total realistic effort | 15–70 working days | 5 working days |
The calculation excludes calibration, BMS tuning, documentation and qualification re-testing, which add comparable increments to either case.
The presented methodology suits facilities where main outside-air AHUs are coupled with distributed recirculation units serving differently classified spaces. It is most valuable where design margins are constrained, late changes occur or qualification timelines are tight. It is less valuable for low-to-moderate-complexity dedicated once-through systems.
The proof of concept shows that system-level CFD provides quantitative pre-balancing outputs, reducing and de-risking commissioning. Subject to live-project validation, CFD digital twins complement practice, enabling right-sized plant and evidence of lower CapEx, OpEx and energy optimization while maintaining thermal conditions, indoor climate and intended facility performance.
The work was carried out through collaboration between Ramboll Life Science and Pharma and the Ramboll Centre of Excellence for CFD. The authors gratefully acknowledge the financial support of both units.
An AI assistant supported the structuring of an initial draft and grammar checking; all technical content and conclusions are the authors' own.
Nielsen, P. V. 2015. Fifty years of CFD for room air distribution., Building and Environment, 91,.
Jiaying Zhang et al. 2023. Predictive control of HVAC by multiple output GRU - CFD integration approach to manage multiple IAQ for commercial heritage building preservation, Building and Environment, 245.
ISO 23247-1:2021, Automation systems and integration — Digital twin framework for manufacturing, Part 1: Overview and general principles, ISO, 2021.
ISO 14644-3:2019. Cleanrooms and associated controlled environments — Part 3: Test methods, 2019.
Follow us on social media accounts to stay up to date with REHVA actualities
0