Atecyr tecnico@atecyr.org | Víctor Soto FrancésPh.D, Member of the Technical Committee of AtecyrThermodynamic Department of the University of Valenciavsoto@ter.upv.es | José Manuel Pinazo OjerPh.D, President of the Technical Committee of AtecyrThermodynamic Department of the University of Valenciajmpinazo@ter.upv.es |
Since the introduction of the EPBD (Energy
Performance in Buildings Directive) in Europe, member states (MS) have
developed a great deal of codes, procedures, rules and software tools. The
European Union (EU) devotes many resources to harmonizing all these codes among
MS, such as the Concerted Action (CA) and the CEN (European Committee for
Standardization) standards. However, few countries follow the complete CEN
standards and there is uncertainty about the current situation. This paper
compares, through a practical case, the CEN standards with codes created in
Spain on the basis of a measured building. The conclusion is that at least in
the Spanish case there is a mismatch with CEN, regarding the losses in the HVAC
distribution sub-systems, which should be fixed. Finally, the results presented
can be useful for other countries which are trying to implement similar codes
to improve their energy efficiency in the building sector.
In 2003 the
European Commission (EC) issued a Directive, 2002/91/EC [8]. On 19 May
The objective of this directive is to promote
the improvement of the energy performance of buildings within the community,
taking into account outdoor climatic and local conditions, as well as indoor
climate requirements and cost-effectiveness. For new and existing buildings
this requires a calculation of the energy performance of the building including
heating, ventilation, cooling and lighting systems, based on primary energy.
Each building must have an energy certificate and regular inspections of
heating, cooling and ventilation systems must be performed. This directive
required all member countries to implement the directive in the building codes
at the national level by January 2006. Until now this has only been implemented
fully in a small number of countries and partially in some others.
As the November 2008 Commission Communication for the original proposal states, buildings have significant untapped potential for cost effective energy savings “which, if realized, would mean that in 2020 the EU will consume 11% less final energy.” The question arises as to whether this goal is actually achievable.
This paper analyses or more precisely investigates the extent to which the MS codes and procedures adhere to the new European CEN standards related to EPBD and MS by using the case of Spain as an example. It is our hope that the conclusions will be extrapolated to other MS.
In the past, the CEN norms related to EPBD began to appear. Some authors (Bjarne et al. [10]) obtained results from the published CEN drafts. This article extends widely their results since the calculationsare done with the definitive version of CEN and the results are compared with real consumption.
The building energy demand and consumption
is estimated by the Spanish software tools and by the CEN standards. Furthermore,
both are compared with measured values from one real building made up of two
blocks which share a common heating facility.
The interest in establishing the comparison
is threefold:
· On the one hand, the goal is to determine if the results from the energy certification scheme are of some utility to the user.
·
On the other hand, when
inspecting or auditing a building, the expert needs to know beforehand the
order of magnitude of the HVAC systems seasonal efficiency and its
decomposition into the generation, distribution, emission and control
sub-systems. By comparing those with measured values the expert is allowed to
issue a report including the advice about improvements.
· Lastly, could it be stated that the effort employed by the expert in issuing an energy certificate and the building model created in the official software tool can be used safely in bi-lateral contracts between energy service companies and state owners, in order to ensure energy savings?
The European Commission has given CEN the
responsibility of developing standards to support the MS to implement the EPBD
directive.
The computation of a building's energy
efficiency is based on the building and its surrounding characteristics and on
the technical systems installed to provide heating, cooling, lighting,
ventilation and domestic hot water, services.
This paper focuses on heating and domestic
hot water (DHW). The input data is the heating energy demand for the winter
period and the DHW energy needs obtained using the Spanish official calculation
tool named LIDER [1].
In their present state, in our opinion, the
cooling aspect of buildings is not as well and deeply treated by CEN standards
as the heating. We therefore excluded the cooling in this analysis.
In particular EN 15316:2007 has been used; the emission is dealt with in part 3-2 [2], distribution in 3-2 [3] and 2-3 [4] and generation is dealt in 3-3 and 4-xx [9 and 10].
Figure 1. General system
structure CEN- standard. Source
www.iee-cense.eu
The CEN calculation methods work on a per sub-system basis: emission to the final user, distribution and generation. CEN computes the energy loses at each sub-level. This allows the comparison of sub-systems and gives the expert an insight on the measures to achieve better energy performance in the building.
The energy loses split into actual loses, auxiliary energy and recoverable loses. Within the latter category, we have included those that have actually been recovered.
Figure 2. System
data i, sub-systems j. Source EN 15603
Legend
i system
analyzed: heating, cooling, DHW.
j sub-systems:
emission, distribution or generation
Qi,j,sld sub-systems
j, heat energy supplied [=Qi,j+1,ent heat input of the next
sub-system (s)]
Ei,j,ent sub-systems
j, energy consumption
Wi,j,aux sub-systems
j, auxiliary energy consumption
Qi,j,aux,rcp sub-systems
j, heat recovery auxiliary energy subsystem
Qi,j,prd sub-systems
j, heat loss
Qi,j,prd,rbl sub-systems
j, recoverable heat loss for heating (not in this sub-system)
Qi,j,prd,rbl sub-systems
j, recoverable heat loss for heating
Qi,j,aux,rbl sub-systems
j, recoverable thermal auxiliary energy
Qi,j,prd,no rbl sub-systems
j, unrecoverable heat loss
Qi,j,aux,no rbl sub-systems
j, non-recoverable auxiliary thermal energy
For the heat generation sub-system CEN establishes
three procedures: by typology, by efficiency or by the cyclical method.
Typology procedure is the less accurate. The
first one is less accurate. It simply divides the estimated energy demand by a
seasonal efficiency obtained by multiplying the nominal efficiency by some
correction factors according to the type and operating mode of the boiler.
The efficiency procedure is based on an
average efficiency computed based on manufacturer data (in fact full and
partial load data) and an estimation of the real load charge of the boiler in
the actual building.
Finally, the cyclical method assumes a consumption of final energy by the generator and formulates a hypothesis about its partial load ratio and iterates until both converge and give the same consumption (normally two iterations are enough).
In Spain the normative abides by the
following European Directives:
·
Directive 2002/91/CE [8], its
recast Directive 2010/31/UE [9] about energy efficiency in buildings.
·
Directive 2006/32/CE about the
efficiency of the final use of energy and energy services reformulated in
Directive 2012/27/UE.
Spain issued the following Royal Decrees:
·
Royal Decree 314/2006 approves
the Spanish Technical Building Code (known as CTE, following its Spanish name)
and Order FOM/1635/2013 from 10 September 2013, which updates the basic
document DB-HE on energy savings. It includes six sections:
○
DB HE-0, Primary non-renewable
Energy consumption limitation of buildings.
○
DB HE-1, Energy demand
limitation of buildings.
○
DB HE-2, Technical buildings
system code. Minimum requirements. (Known as RITE).
○
DB HE-3, Artificial lighting
energy systems efficiency.
○
DB HE-4, Minimum solar energy
or equivalent non-renewable contribution to domestic hot water (DHW) (achieving
the same primary energy savings and fossil CO2 emissions).
○
DB HE-
·
Royal Decree 47/2007 about
Energy Certification of new buildings, substituted by Royal Decree 235/2013, which
includes existing buildings.
·
Royal Decree 1027/2007 approves
RITE and its modifications in Royal Decree 238/2013.
Thus, the minimum requirements of energy
efficiency of the EPBD are split into; primary non-renewable energy, energy
demand, technical systems, lighting, DHW and photovoltaic limits. All are
mandatory constraints.
·
Energy Consumption (CTE DB
HE-0) RD 235/2013 establishes more efficient construction and rehabilitation of
buildings and the need to inform the clients or state holders about the energy
status of their building or house.
· Energy demand (CTE DB HE-1) substituted the old NBE CT-79. It sets limits on heating and cooling demand as a whole thus avoiding just dealing, avoiding comply with legislation, with very efficient HVAC systems and consumers of renewable energy.
·
HVAC systems (RITE) deal with
the design, sizing, installation, maintenance and periodic inspection of the
cooling and heating generators. It also limits the efficiency of these
facilities from below.
Additionally, HE-4 imposes the need to employ renewable energy for DHW and the heating
of swimming pools.
·
Artificial lighting (CTE DB
HE-3) is the minimum energy efficiency of artificial lighting systems measured
by the VEEI ratio (W/m²/100 lux). The limit depends on consumers' activity
and maximum installed power. It also establishes aspects about the natural
lighting.
·
Renewable electric energy (CTE
DB HE-5) is a function of the total occupied area.
Summarizing, the code imposes limits and
constraints at the architecture level and at the HVAC system level.
Figure 3 shows three buildings (let us name them: A, B and C) with the same
consumption. Only B fulfils the present legislation, since it fulfils both the
limit consumption (point P), the maximum energy demand (dotted line) and the
minimum HVAC systems efficiency (vertical line passing through P). The
permitted region is thus that below the dotted line and to the right.
Figure 3.Minimum consumption requirements for new buildings.
Point P fixes the maximum non-renewable
primary energy consumption. Building A has a forbidden low HVAC system
efficiency while building C has a forbidden high energy demand. Notice that
although it seems paradoxical, both A and C have lower energy consumption than
the maximum allowed (horizontal line passing through P).
Energy Certification (RD 235/2013) is the
mechanism in charge of achieving a driving force to more efficient buildings.
For instance, building D (see Figure 3) can be reached
from B just by means of improving the energy need. Reaching building F can be
achieved by improving the HVAC efficiency. Building E may be reached from B if
both thermal performances of the building and HVAC systems are improved.
In Spain the official tools to study these
aspects are the following:
a) General option, or performance
option, you have two programs called: CALENER VyP or CALENER GT. The last one
is for large tertiary buildings. It is valid for new and existing buildings. It
requires a 3D modelling of the building and its surroundings. It constitutes an
hourly dynamical multi-zone method.
b) Simplified option, the
“simplification” comes from the input method. In this case no 3D model of the
building is defined. This does not mean necessarily that the internal
computation method is simplified, although it could be. At present there are
four recognized methods: CERMA (single zone hourly method), Ce1, Ce2 for
dwellings, Ce3, and CE3x all types of buildings.
CALENER VyP is taken as the reference and
all other methods should yield the same or worse results than CALENER VyP. Ce3
is a simplification of CALENER GT, since it removes the definition of the
hydraulic circuits.
Table 1. Legislative Matrix to meet building energy legislation in Spain.
Option | GENERAL | SIMPLIFIED | ||||
Building
type | Housing | Little
tertiary | Large
tertiary | Housing | Little
tertiary | Large
tertiary |
New | Calener VyP | Calener GT | Ce1 | CES PT* | ||
Ce2 | ||||||
Ce3* | ||||||
CE3x* | ||||||
CERMA | - | |||||
Existing | ||||||
Ce3 | ||||||
CE3x | ||||||
* Yet to be recognized by the Spanish
administration. These are not listed programs derived from
the additional capabilities and unique solutions |
CALENER VyP and CALENER GT are dynamical
simulation programs, but their kernel is different. CALENER VyP is an extension
of LIDER (energy limit tool CTE DB HE-1 2006), which uses another tool (in
Java) named ESTO2.
In the case of CALENER GT, both energy demand and HVAC consumption are computed using the DOE2.2 calculation kernel. However, since the building must fulfil the energy demand limit, it must first be run with LIDER and then the model is exported to CALENER GT.
The study of a building in Madrid is shown
in this section. The building has a rectangular section of 80 m²(861.14
SQFT), has two floors and each floor has height 3 m (9.84 FT). The CEN and
CALENER tools have been employed in the calculations.
The first problem comes from the fact that
CALENER GT and CALENER VyP do not give exactly the same energy demand since the
kernel is different. Another problem which arises is that the occupancy and
internal gains schedules are closed in CALENER VyP [5], i.e. are not editable.
Since these are editable in CALENER GT the same values of CALENER VyP have been
used in CALENER GT. The weather files are the same for both.
With these particularities CALENER GT in
general gives smaller energy demand values than CALENER VyP[1]. (See Figure 4)
Figure 4. Net energy demand for space heating VyP (LIDER) vs GT.
The consumption in CALENER VyP is done by
correcting the nominal performance values of each generator at an hourly rate,
using algebraic equations. The correction depends just on the part load ratio
of the generator (energy demand divided by the nominal power). It does not take
into account the start/stop loses or the stand-by loses.
Although CALENER VyP does ask for the
outlet generator temperature, this variable is not used to correct the
performance of the boiler. Distribution losses and regulation sub-systems are
not taken into account.
Regarding the emission sub-system, only the thermal power of the emitters is asked. It does not take into account their location within the thermal zone, control or type. Therefore the losses associated to this information are disregarded.
In conclusion CALENER VyP, does not take
into consideration the loss due to the distribution or emission sub-systems.
For the generation sub-systems only its performance at part load is taken into
consideration.
It seems obvious that if the energy consumption is compared between both methods (CALENER VyP and CEN), then the CEN-standards, which do take all of these into account, will return different results than the CALENER VyP, although the energy demand is the same.
Figure 5 shows monthly consumption obtained using the three CEN methods
(typology, efficiency and cyclical) and the one obtained from CALENR VyP. The
energy demand used as input value is also shown in this figure.
Figure 5.
Consumption of heating in CALENER VyP vs standard CEN.
CALENER VyP values are closer to the demand since the losses from distribution and emission are not considered. This means that the expert will not see the effect in efficiency from low temperature systems or improve the thermal isolation of the distribution system or a better or shorter distribution layout or control, for example.
CEN provides much higher values than
CALENER VyP, because the losses are considered. As will be shown below, the
results are also closer to actual measured values.
The CEN procedure, allows quantifying how
much the consumption of the generator is increased due to each of its
downstream sub-systems. The values are just added. This would allow the expert
to provide more accurate advice to the building owner.
Figure 6 shows the results obtained from the three CEN methods. It is of
note that the energy requirement or demanded by the distribution sub-system to
the generator is the same. The three methods only affect the generator
calculation.
Figure 6.
Consumption for an emission, distribution and generation sub-system.
As in the case of CALENER VyP the energy consumption
computed by CALENER GT is done by correcting the nominal performance values on
an hourly basis.
However, CALENER GT allows for a more
detailed definition of the sub-systems than CALENER VyP. It allows the definition of the hydraulic
circuits namely hot water, chilled water, condensation, double pipes, etc.
Unfortunately, it does not ask for the length of the piping work, which spaces
are crossed by the network or its level of thermal isolation. In short, it
basically suffers from the same problems as CALENER VyP.
Figure 7 shows the consumption obtained by the three CEN[2] methods and that from CALENER GT. The energy demand is also shown here.
Figure 7.
Consumption of heating in CALENER GT vs standard CEN.
Figure 7 shows that the conclusions drawn before from the comparison between
CEN and CALENER VyP are also valid for CEN and CALENER GT, and the deviations
are kept.
Moreover, CALENER GT gives lower
consumptions than CALENER VyP, probably because, as noted above, the energy
demands computed by VyP and GT are different.
From the two previous comparisons, it can
be concluded that for CALENER the present definition of the heating system is
not accurate enough if they should be comparable with CEN standards. It is
likely that the lack of CALENER leads to an underestimation of the actual
energy consumption of the buildings. This will be checked in the next section.
A multifamily house building, situated in
Bermeo, in northern Spain, was measured and the same strategy of comparison used
in the previous section was employed.
The sensors
placed in the building provided us with the following records:
·
Total
consumption of natural gas boilers delivered (bills).
·
Domestic
hot water meters for each of the dwellings (in m³)
·
Thermal
energy meter for each housing (see Figure 8).
Energy
meters for each dwelling indicate the input energy to the emission subsystem (QCLF,ems,ent
= QCLF,dst,sld) and the volumetric water consumption yields
approximately the amount of energy demand DHW for service (QDHW).
Figure8.
Regulation scheme housing. AF Cool Water.
In first place, the consumption is computed
by CALENER and CEN methods.
In second place, the measured values are
compared with the previous results from CEN and CALENER.
The building has two blocks, each of them containing five floors. There is a central heating and a DHW system with solar collectors. The boiler room is placed below one of the blocks.
Figure 9.
Images of the building under study. Left image LIDER. Right real image.
The energy demand has been obtained from
LIDER (i.e. CALENER VyP) but has been corrected for the actual occupancy of the
buildings.
For this amount of demand values from the
hourly data delivered by the postCALENER program demand values obtained for an
ambient temperature above 18°C (labelled for control of the generation system
and decide by the designer and maintainer) were excluded (not joined) and not
satisfying hours that are within the schedule heating (Community agreement is
from 8 to 21 h inclusive) were excluded.
This choice is taken well to fit the actual time of heating the building and to try to calibrate (adjust) the energy estimation of CEN standards to bring the estimated consumption to actual consumption. If this is not done well, the initial monthly demand for calculation (accepting the default values assigned to the residential program) would be approximately 15% higher.
When using the CEN standards two
assumptions have been employed. In first place, it has been assumed that the
input information of the buildings coincides with that needed by the CEN
standards. For instance, the length of the piping work is estimated using CEN
correlations and not using the actual measured values or the actual places they
cross. Second, the CEN has been employed but now using the actual measured
values and right places that the piping network crosses.
CEN gives the consumption for heating and
DHW and for the emission, distribution and generation sub-systems separately.
In order to take into account the increase
of energy demand for the distribution sub-system (Qi,dst,sld) due to
the emission sub-system, the following variables should be considered:
·
Regulation of the zone
temperature.
·
Mean logarithm temperature
difference with an internal reference temperature of
·
Location of the radiator
elements.
· Type of terminal unit
·
Free height of the zone.
The electric consumption of the auxiliary systems can be neglected (WCLF,aux = 0) since in dwelling (as in this case) is zero because the regulation is done with thermostatic valves.
To compute the increase in the demand of
energy to which the generator sub-system is submitted (Qi,gen,sld)
by the distribution sub-system, CEN points out the following variables:
·
Electric power of the
circulation pumps.
·
Mean temperature of the
distribution network.
·
Length, section and thermal
isolation thickness and location of the pipes through the buildings spaces.
·
Regulation of the secondary
systems: ON-OFF, two-way or three-way valves.
When applying the CEN standards a challenge
arises when the distribution sub-system was taken independently for the
computation of the thermal loses, regarding: actual length of the piping,
assigning a mean temperature of the fluid inside the pipes for each calculation
period.
In case of
the generator it seems logical to compute its consumption based on its nominal
capacity and efficiency and correcting those values as a function of the part
load ratio and the outlet temperature of the water.
Nevertheless,
the generator loses due to its hot body and to the stop-start cycles
during the stand-by periods should be included (and are not in CEN standards).
This separated evaluation allows to point out what is responsible for the greater consumption and therefore to focus the saving measures (if it is profitable) towards that element or sub-system. The results are shown in Table 2.
Table 2. Consumption estimated by the CEN standards subsystem (assuming two real values).
Sub-system | CLF (kWh/m²) | η (%) | DHW (kWh/m²) | η (%) |
Qi | 41.4 | - | 13.1 | - |
Qi,ems,sld | 48.0 | 86.2 | - | - |
Qi,dst,sld | 56.9 | 84.4 | 16.4 | 79.9 |
Qi,gen,sld | 57.6 | 98.8 | 16.8 | 97.6 |
Ei,ent | 57.6 | 71.9 | 16.8 | 78.0 |
As Table 2 shows, the worst result comes from the distribution sub-system for both services. The generation sub-system, in contrast, has quite a
good performance. Therefore the saving measures should be focused in first
place on the piping network.
If the CEN and measured values are compared,
then it seems that both are quite similar using any assumption; the estimations
proposed by CEN (first assumption) starting from general geometric data and
using the actual measured values (second assumption).
It can be concluded that the CEN standards
in our samples give a consistent result. They yield (in this case) slightly
higher values than the actual ones. In the worst case, that is, assuming the
parameterized values of CEN (first assumption), they are 26% higher (starting from the corrected energy demand
from LIDER). (See Table 3).
Table 3. Measuredconsumption vs CEN with theoretical
and real values.
MEASURED | THEORETICAL CEN | REAL CEN |
301,081 | 380,561 | 325,819 |
% CEN/REAL | 126 | 108 |
Figure 10 shows the monthly values of actual measured consumption and those computed by CEN (ECLF-ACS,ent,THEORITICAL is for the second assumption and ECLF-ACS,ent,REAL refers to the first assumption).
Figure 10.
Measuredconsumption vs CEN with theoretical and real values.
In the previous section the results for the first building in Madrid (section three of this article) pointed that CALENER VyP gives smaller consumptions than CEN standards.
As mentioned, it is due to the lack of
emission and distribution sub-systems. In the building of Bermeo this
represents more than 50% of the losses of the heating system (with respect to
the computed demand).
Running the Bermeo building model in CALENER VyP gives Table 4.
Table 4. Measured consumption vs CALENER VyP.
MEASUREDCONSUMPTION (kWh/year) | CALENER VyP (kWh/year) |
301,081 | 263,739 |
%VyP/REAL | 88 |
The actual consumption of the building is much bigger (301,081 kWh > 263,739 kWh) than the results from CALENER VyP, even starting with a higher (and unreal) energy demand (since CALENER VyP does not allow to change the schedules).
Figure 11 shows the consumption computed with CALENER VyP compared with the
measured values on a monthly basis.
Figure 11.
Measuredconsumption vs CALENR VyP.
In this case the schedules and thermostats are editable. The actual values of the Bermeo building have been used. The occupancy from 8 PM until 9 PM, and the availability of the heating system have been used. This is why the results from CALENER GT are even smaller than those of CALENER VyP (default means more hours of operation).
Table 5 illustrate the running the Bermeo building model into CALENER GT [5].
Table 5. Measured consumption vs CALENER GT
MEASUREDCONSUMPTION (kWh/year) | CALENER GT (kWh/year) |
301,081 | 147,294 |
% GT/REAL | 49 |
The measured values are much higher than the
computed ones (301,081 kWh > 147,294 kWh). The CALENER GT results
are approximately 51% smaller than reality despite the possibility of adjusting
the schedules. In much the same way as with CALENER VyP, this is due to the
lack of a model for the distribution and emission sub-system.
Figure 12 compares CALENER GT and measure measures results per month.
Figure 12.
Measuredconsumption vs CALENER GT.
Figure 13 compares the measured values with those of CALENER and CEN.
Figure 13.
Measuredconsumption vs. estimated.
Energy consumption in Spain is based on
Royal Decree (RD) 235/2013. In this case it does not take into account the
emission, distribution sub-systems and stand-by loses of the generator. The CEN
standards do take into account these loses thus leading to energy consumptions
which are likely closer to the actual ones.
Figure 12 demonstrates that it is possible to obtain quite good
approximations to the energy consumptions of buildings (in this case with a
deviation below 8%), using the CEN standards and a corrected energy demand
computed using a dynamical hourly method.
This indicates that it is crucial to be
able to edit the schedules, HVAC availability, occupancy, etc.
In the case of Spain the national
computation tool CALENER does not allow the estimation of actual energy
consumption. Moreover, it disregards important sub-systems. It results in smaller
energy consumption than reality (even in the case of CALENER VyP where the
schedules are not editable).
In the case of the DHW service, whose
demand is very stable, during the summer period the difference between the
computed values and the actual measured ones is very different. This is due to
the fact that CALENER does not consider the recirculation thermal losses. This
does not happen with the CEN standards.
CEN standards give an accurate estimation
of the actual consumption using the computed and corrected energy demand. If
the actual sizing of the piping network is used, the deviations are around 25%.
Moreover it splits the consumption responsibility.
CALENER is used as the reference. That is
to say, other recognized software must be compared with respect to CALENER and
this poses a drawback.
The loses of the emission sub-system constitute
around 15% of the energy demand, while the distribution losses represent 8% of
the energy supply to the emission sub-system and more than 50% in recirculation
sub-systems in DHW. The losses of the boilers when they are in stand-by due to
their hot body and chimney are not considered by any method.
All these problems detected in the case of Spain
are likely to be present in other MS. Therefore, they should be detected and
fixed if the goal of better energy performance of buildings as well as a
harmonised legislation are to be achieved in Europe.
[1] LIDER. Computer application that meets the
general verification option requiring Limiting Energy Demand established in the
Basic Document of Habitability and Energy of the Technical Building Code
(CTE-HE1). Sponsored by the Ministry of Housing and the Institute for
Diversification and Saving of Energy (IDAE) www.codigotecnico.org
[2] EN
15316-2-1:2007. Heating systems in buildings-Method for calculation of system
energy requirements and system efficiencies- Par 2-1: Space heating emission
systems
[3] EN
15316-2-3:2007. Heating systems in buildings-Method for calculation of system
energy requirements and system efficiencies- Par 2-3: Space heating
distribution systems
[4] EN
15316-3-2:2007. Heating systems in buildings-Method for calculation of system
energy requirements and system efficiencies- Par 3-2: Domestic hot water
systems, distribution.
[5] DTIE 7.03: Entrada de datos a los programas LIDER y CALENER VyP. Arcadio García Lastra, Antonio García Laespada, Víctor Soto Francés y José Manuel Pinazo. ISBN: 978-84-95010-26-1 Depósito Legal: M-36274-2008.
[6] DTIE 7.04:Entrada de datos al programa CALENER GT. Arcadio García Lastra, Antonio García Laespada, Víctor Soto Francés y José Manuel Pinazo. ISBN: 978-84-95010-32-1 Depósito Legal: M-36275-2010.
[7] DTIE 10.05 Principios Básicos de las Calderas de Condensación. Arcadio García Lastra. Dirección Salvador Solsona Cortadellas ISBN: 978-84-95010-30-8 Depósito Legal: M-58629-2008.
[8] Directive 2002/91/EC of the European
Parliament and of the Council of 16 December 2002 on the energy performance of
buildings.
[9] Directive 2010/31/EU on the energy
performance of buildings (recast) - 19 May 2010
[10] Calculation of the yearly energy performance
of heating systems based on te European Building Energy Directive and related
CEN standards. Bjarne W. Olesen (ICIEE/BYG, Technical University of Denmark,
Denmark), Michele de Carli (Dipatimento di Fisica Tecnica, University of
Padova, Italy). Energy and Buildings 43 (2011) 1040-1050.
Follow us on social media accounts to stay up to date with REHVA actualities
0